Your current location:Home>Products > CQ130-60 type of cast-in-place lining machine
CQ130-60 type of cast-in-place lining machine
 
 

First, the introduction of cast-in-place lining machine

    CQ130-60 cast-in-place channel lining machine is our company engineering and technical personnel according to market needs, play mechanism of concrete molding technology research accumulated more than 40 years of successful experience, is simple construction, easy operation, high production efficiency, low labor intensity , The equipment structure is scientific and reasonable, full-featured, stable performance, high degree of automation for the target design and development of the leading areas of the new generation of channel lining machine. The use of CQ130-60 cast-in-place channel lining machine construction site pouring U-shaped, ladder, rectangular impermeable channel without the traditional construction method of the template investment and template installation removal and handling a large number of materials, can reduce construction costs by 50%.

Second, the drainage bed construction methods

1, in accordance with the slope to determine the slope of the bed and the height of the basis of stratified rolling, so that the soil density of not less than 1600Kg / m3;

2, set the channel centerline to the center line to both sides in accordance with the channel width of the release of both sides;

3, according to the size of the line and the slope of the slope than the excavation of the earth, not greater than the standard section, do not dig backfill, slightly less than the standard section is appropriate (the machine has a bed of bed repair function).

Third, the use of lining machine

1, in the shape of the channel along the bottom of the slope in accordance with the height of the slope and the lining of the laying wheel laying wheel guide rails;

2, check the lining of the various parts and screws are tightened, the lining machine laying a good guide rails, so that the lining of the guide mode, vibration mode and sliding mode and soil in the same center line;

3, connecting the wire rope and traction hook, and the rope rope pulley hook placed 30m at the top of the lining machine is fixed, put the wire rope, you must first put the clutch in a separate state, put the rope after the clutch back to the original position;

4, no load test: start the vibrator and hoist, in the case of no load to check whether the normal work of the machine, if no exception, can be prepared on the lining;

5, concrete mixing water-cement ratio to 0.44-0.48 is appropriate, aggregate particle size is not greater than the wall thickness of 1/4, gravel ratio is not greater than 44% of the stone, can add no more than 25% of cement content of coal Gray to improve the mobility of concrete, to promote the transaction, to achieve external light real. Specific according to the label and according to soil and weather and other factors;

6, lining, the filler to the silo of 2/3, the first open vibration, and then open the hoist to walk, while walking along the packing vibration, with the artificial face;

7, according to the channel level, every 4-6 meters set expansion joints together, in the lining after the concrete in the condensation before the use of portable cutting expansion joints;

8, on the shape of the concrete channel coating conservation.

 

Copyright ©Copyright (C) Shandong Yasheng Heavy Industry Co., Ltd. All rights reserved. 2002-2018 ICP: 08000463; 魯ICP備10022443號-6

Address: Gaomi City, Shandong Province, Yi'an Road, Middle Road, No. 4399 (Gaomi City, high-speed intersection 5 km south of the road east) 

National free hotline: 400-050-9488 (machine)  400-649-6388 (water machinery)   Fax: 0536-2334888

Technical support: enterprise network

技術(shù)支持



久久精品国产亚洲av品| 国产精彩对白视频一区二区三区| 精品一区二区三区久久| 亚洲一道综合一区二区三区| 女主播国产专区在线观看| 国产黄色丝袜在线观看| 亚洲性感毛片在线视频| 日本精品一区二区在线看| av中文在线中文亚洲| 国产一区二区青草久久| 日韩精品视频在线观看无| 亚洲伦理一区二区三区中文| 日韩人妻精品久久免费| 久草免费福利资源在线观看| 国产破外大片免费的黄色大片| 亚洲免费视频网站在线| av在线免费观看美日韩| 亚洲精品一区二区三区三区| 亚洲一本一道久久香蕉| 日韩毛片免费看美日韩毛片| 日本中出熟女一区二区| 男女日吊视频在线观看| 九九热精品在线免费视频| 国产一区二区三区av网站| 在线播放国产精品三级网| 日本超骚少妇熟妇视频| 亚洲丰满老熟女激情av| 亚洲高清在线自拍视频| 人妻久久精品一区二区三蜜桃| 成人午夜精品视频在线观看| 蜜臀av一区二区三区人妻| 亚洲国产女同在线免费观看| 日本在线观看免费高清| 日本一区二区三区播放| 手机av在线 中文字幕| 亚洲综合98夜夜躁精品| 亚洲一区二区在线观看网站| 欧美午夜视频一区二区福利| 日韩女优在线一区二区| 欧美高清在线观看视频| 久久精品久99精品免费|